Project: I-35 and US 290, Texas
Summary
The I-35/US-290 Interchange was built to reduce congestion, increase capacity, and provide access to main employment centers in Austin, TX. It was the final piece of the U.S. Interstate system to be built in Texas.
Characteristics and Setting
Classification/Type
Interchange
Transportation Mode
Highway
Usage
62,000
Length (mi)
2.70
Economic Distress
0.89
Population Density (ppl/sq mi)
952
Population Growth Rate (%)
2.1%
Employment Growth Rate (%)
1.4%
Market Size
570,810
Airport Travel Distance (mi)
9.0000
Topography
15
Geography
Region
Southwest
State
TX
County
Travis
City
Austin
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
2001
Post Construction Study Date
2007
Construction Start Date
1999
Construction End Date
2002
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2001
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$31,600,000
Actual Cost (2022$)
$64,809,400
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-35 and US 290, Texas
Attachments
No attachments were submitted.