Project: Elwood, IL -CenterPoint Intermodal Center -BNSF Logistics Park
Summary
BNSF's Logistics Park Chicago (LPC) in Elwood, IL was developed to address freight delays in Chicagos congested rail yards. The project combines intermodal transloading with warehouse space for major retailers, shippers, and logistics contractors.
Characteristics and Setting
Classification/Type
Freight Terminal
Transportation Mode
Highway
Usage
7,600
Length (mi)
0.00
Economic Distress
0.91
Population Density (ppl/sq mi)
786
Population Growth Rate (%)
4.4%
Employment Growth Rate (%)
4.5%
Market Size
550,104
Airport Travel Distance (mi)
54.0000
Topography
2
Geography
Region
Great Lakes / Plains
State
IL
County
Will
City
Elwood
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
Highway and Rail
Timing
Initial Study Date
2000
Post Construction Study Date
2008
Construction Start Date
2000
Construction End Date
2002
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1997
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$1,080,000,000
Actual Cost (2022$)
$2,411,598,300
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $1,000,000,000
- Intermodal Actual Cost (2022$)
- $1,451,445,483
- Highway Road Access Improvement Cost (YOE $)
- $80,000,000
Freight Terminal
- Container Volume (Metric Tons)
- N/A
- Container Volume (TEUs)
- 1,500,000
- All Cargo Volume (Metric Tons)
- N/A
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Elwood, IL -CenterPoint Intermodal Center -BNSF Logistics Park
Attachments
No attachments were submitted.