Project: Lake Natoma Crossing Bridge
Summary
The Lake Natoma Bridge project in Folsom, California was built across the American River in order to relieve significant congestion. The new bridge is over 2,000 feet long and consists of 4 vehicle lanes, 2 bike lanes, 2 pedestrian lanes, and one reserved lane for future light rail or other high occupancy vehicles.
Characteristics and Setting
Classification/Type
Bridge
Transportation Mode
Highway
Usage
27,800
Length (mi)
0.38
Economic Distress
1.04
Population Density (ppl/sq mi)
1,422
Population Growth Rate (%)
1.6%
Employment Growth Rate (%)
1.5%
Market Size
631,388
Airport Travel Distance (mi)
25.0000
Topography
4
Geography
Region
Rocky Mountain / Far West
State
CA
County
Sacramento
City
Folsom
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2001
Construction Start Date
1997
Construction End Date
1999
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$75,000,000
Actual Cost (2022$)
$167,472,100
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
LAKE NATOMA BRIDGE
Attachments
No attachments were submitted.