Project: Potato Hill Bridge
Summary
The Potato Hill Bridge project was a replacement of an overpass over Interstate 90 in Moses Lake, Washington to increase its height to accommodate freight trucks using I-90 between Ephrata and Moses Lake. The project ended a 40-mile truck detour.
Characteristics and Setting
Classification/Type
Bridge
Transportation Mode
Highway
Usage
4,920
Length (mi)
0.09
Economic Distress
1.41
Population Density (ppl/sq mi)
30
Population Growth Rate (%)
1.3%
Employment Growth Rate (%)
1.1%
Market Size
16,390
Airport Travel Distance (mi)
45.0000
Topography
16
Geography
Region
Rocky Mountain / Far West
State
WA
County
Grant
City
Moses Lake
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2008
Construction Start Date
2006
Construction End Date
2006
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$3,250,000
Actual Cost (2022$)
$5,453,800
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
POTATO HILL BRIDGE