Project: Potato Hill Bridge

Summary

The Potato Hill Bridge project was a replacement of an overpass over Interstate 90 in Moses Lake, Washington to increase its height to accommodate freight trucks using I-90 between Ephrata and Moses Lake. The project ended a 40-mile truck detour.

Characteristics and Setting

Classification/Type Bridge
Transportation Mode Highway
Usage 4,920
Length (mi) 0.09
Economic Distress 1.41
Population Density (ppl/sq mi) 30
Population Growth Rate (%) 1.3%
Employment Growth Rate (%) 1.1%
Market Size 16,390
Airport Travel Distance (mi) 45.0000
Topography 16

Geography

Region Rocky Mountain / Far West
State WA
County Grant
City Moses Lake
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2008
Construction Start Date 2006
Construction End Date 2006
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $3,250,000
Actual Cost (2022$) $5,453,800

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

POTATO HILL BRIDGE