Project: Lexington Bridge between I-5 and SR 411
Summary
The Lexington Bridge was designed to improve access to the unincorporated community of Lexington, decrease congestion along SR 411, and alleviate traffic on the other bridges that cross the river to the south
Characteristics and Setting
Classification/Type
Bridge
Transportation Mode
Highway
Usage
6,000
Length (mi)
0.60
Economic Distress
1.41
Population Density (ppl/sq mi)
87
Population Growth Rate (%)
1.1%
Employment Growth Rate (%)
0.4%
Market Size
52,752
Airport Travel Distance (mi)
52.0000
Topography
21
Geography
Region
Rocky Mountain / Far West
State
WA
County
Cowlitz
City
Kelso-Lakeview
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2008
Construction Start Date
2006
Construction End Date
2007
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$15,300,000
Actual Cost (2022$)
$25,675,000
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
LEXINGTON BRIDGE BETWEEN I-5 AND SR 411
Attachments
No attachments were submitted.