Project: Lexington Bridge between I-5 and SR 411

Summary

The Lexington Bridge was designed to improve access to the unincorporated community of Lexington, decrease congestion along SR 411, and alleviate traffic on the other bridges that cross the river to the south

Characteristics and Setting

Classification/Type Bridge
Transportation Mode Highway
Usage 6,000
Length (mi) 0.60
Economic Distress 1.41
Population Density (ppl/sq mi) 87
Population Growth Rate (%) 1.1%
Employment Growth Rate (%) 0.4%
Market Size 52,752
Airport Travel Distance (mi) 52.0000
Topography 21

Geography

Region Rocky Mountain / Far West
State WA
County Cowlitz
City Kelso-Lakeview
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2008
Construction Start Date 2006
Construction End Date 2007
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $15,300,000
Actual Cost (2022$) $25,675,000

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

LEXINGTON BRIDGE BETWEEN I-5 AND SR 411