Project: US 25 Kentucky
Summary
The East Dry Ridge Connector is a two-lane rural collector that removes traffic from local roads in downtown Dry Ridge, KY. The road was built to attract new industrial development to a large industrial park east of the city, and to eliminate truck traffic in downtown Dry Ridge.
Characteristics and Setting
Classification/Type
Connector Highway
Transportation Mode
Highway
Usage
5,800
Length (mi)
2.20
Economic Distress
1.20
Population Density (ppl/sq mi)
95
Population Growth Rate (%)
1.4%
Employment Growth Rate (%)
0.5%
Market Size
174,145
Airport Travel Distance (mi)
28.0000
Topography
14
Geography
Region
Southeast
State
KY
County
Grant
City
Dry Ridge
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2008
Construction Start Date
2002
Construction End Date
2005
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$11,266,000
Actual Cost (2022$)
$22,413,100
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
EAST DRY RIDGE CONNECTOR, DRY RIDGE, KY