Project: US 25 Kentucky

Summary

The East Dry Ridge Connector is a two-lane rural collector that removes traffic from local roads in downtown Dry Ridge, KY. The road was built to attract new industrial development to a large industrial park east of the city, and to eliminate truck traffic in downtown Dry Ridge.

Characteristics and Setting

Classification/Type Connector Highway
Transportation Mode Highway
Usage 5,800
Length (mi) 2.20
Economic Distress 1.20
Population Density (ppl/sq mi) 95
Population Growth Rate (%) 1.4%
Employment Growth Rate (%) 0.5%
Market Size 174,145
Airport Travel Distance (mi) 28.0000
Topography 14

Geography

Region Southeast
State KY
County Grant
City Dry Ridge
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2008
Construction Start Date 2002
Construction End Date 2005
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $11,266,000
Actual Cost (2022$) $22,413,100

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

EAST DRY RIDGE CONNECTOR, DRY RIDGE, KY

Attachments

No attachments were submitted.