Project: Bayport TX

Summary

The Bayport Intermodal marine terminal was built to alleviate growing levels of container congestion at nearby Barbours Cut terminal. Phase I included development of 65 acres with two berths sharing 6 cranes and three berths for a cruise ship terminal.

Characteristics and Setting

Classification/Type Freight Terminal
Transportation Mode Highway
Usage 29,000
Length (mi)
Economic Distress 1.11
Population Density (ppl/sq mi) 2,242
Population Growth Rate (%) 2.1%
Employment Growth Rate (%) 1.4%
Market Size 1,707,419
Airport Travel Distance (mi) 24.0000
Topography 1

Geography

Region Southwest
State TX
County Harris
City Seabrook
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2008
Construction Start Date 2004
Construction End Date 2006
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2007
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $400,000,000
Actual Cost (2022$) $653,043,800

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$400,000,000
Intermodal Actual Cost (2022$)
N/A
Highway Road Access Improvement Cost (YOE $)
$0

Freight Terminal

Container Volume (Metric Tons)
4,198,520
Container Volume (TEUs)
N/A
All Cargo Volume (Metric Tons)
N/A

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Bayport Intermodal Marine Terminal Texas

Attachments

No attachments were submitted.