Project: I-476 Blue Route

Summary

Motivation for the I-476 Blue Route highway centered around providing a beltway around the Philadelphia region and relieving traffic on local roads and state highways west of the city. Due to a challenge based on environmental impacts that delayed construction of portions of the highway, the Blue Route was constructed in pieces between 1979 and 1992.

Characteristics and Setting

Classification/Type Beltway (within Metro Area)
Transportation Mode Highway
Usage 106,000
Length (mi) 15.70
Economic Distress 0.93
Population Density (ppl/sq mi) 1,528
Population Growth Rate (%) 0.7%
Employment Growth Rate (%) 1.0%
Market Size 1,493,432
Airport Travel Distance (mi) 15.0000
Topography 5

Geography

Region New England/Mid-Atlantic
State PA
County Delware
City Philadelphia
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1984
Post Construction Study Date 2008
Construction Start Date 1985
Construction End Date 1992
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1991
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $617,200,000
Actual Cost (2022$) $1,660,376,500

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

I-476 Blue Route