Project: I-476 Blue Route
Summary
Motivation for the I-476 Blue Route highway centered around providing a beltway around the Philadelphia region and relieving traffic on local roads and state highways west of the city. Due to a challenge based on environmental impacts that delayed construction of portions of the highway, the Blue Route was constructed in pieces between 1979 and 1992.
Characteristics and Setting
Classification/Type
Beltway (within Metro Area)
Transportation Mode
Highway
Usage
106,000
Length (mi)
15.70
Economic Distress
0.93
Population Density (ppl/sq mi)
1,528
Population Growth Rate (%)
0.7%
Employment Growth Rate (%)
1.0%
Market Size
1,493,432
Airport Travel Distance (mi)
15.0000
Topography
5
Geography
Region
New England/Mid-Atlantic
State
PA
County
Delware
City
Philadelphia
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1984
Post Construction Study Date
2008
Construction Start Date
1985
Construction End Date
1992
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1991
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$617,200,000
Actual Cost (2022$)
$1,660,376,500
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-476 Blue Route