Project: Emerson Park MetroLink

Summary

Championed by community grassroots activism, Emerson Park Station was built on the St. Louis MetroLink light rail red line linking a low-income community in East St. Louis with the regions main employment centers.

Characteristics and Setting

Classification/Type In-fill Transit Station
Transportation Mode Light Rail
Usage 1,719
Length (mi) 0.00
Economic Distress 1.30
Population Density (ppl/sq mi) 392
Population Growth Rate (%) 0.4%
Employment Growth Rate (%) 0.9%
Market Size 576,935
Airport Travel Distance (mi) 34.0000
Topography 4

Geography

Region Great Lakes / Plains
State IL
County St. Clair
City East St. Louis
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Transit

Timing

Initial Study Date 1998
Post Construction Study Date 2007
Construction Start Date 1999
Construction End Date 2001
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2000
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $3,000,000
Actual Cost (2022$) $6,272,500

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Emerson Park MetroLink

Attachments

No attachments were submitted.