Project: State Route 126, Fenton Lake Bridge

Summary

The Fenton Lake bridge was reconstructed to meet safety regulations and widened to two lanes in order to support additional visitors and large recreational vehicles accessing the Fenton Lake state park. Sections of State Route 126 were also re-aligned and paved to improve driving conditions.

Characteristics and Setting

Classification/Type Access Road
Transportation Mode Highway
Usage 360
Length (mi) 2.80
Economic Distress 0.96
Population Density (ppl/sq mi) 30
Population Growth Rate (%) 3.8%
Employment Growth Rate (%) 3.1%
Market Size 195,258
Airport Travel Distance (mi) 51.0000
Topography 12

Geography

Region Southwest
State NM
County Sandoval
City Jemez Springs
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 2005
Post Construction Study Date 2008
Construction Start Date 2005
Construction End Date 2006
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2006
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $10,000,000
Actual Cost (2022$) $16,781,100

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

State Route 126, Fenton Lake Bridge

Attachments

No attachments were submitted.