Project: I-20 Interchange
Summary
The I-20 Industrial Drive interchange project is a new grade-separated diamond interchange constructed to improve access to the Hawkins Field industrial park and Hawkins Field airport
Characteristics and Setting
Classification/Type
Interchange
Transportation Mode
Highway
Usage
1,800
Length (mi)
0.00
Economic Distress
1.26
Population Density (ppl/sq mi)
289
Population Growth Rate (%)
0.2%
Employment Growth Rate (%)
-0.8%
Market Size
222,093
Airport Travel Distance (mi)
19.0000
Topography
4
Geography
Region
Southeast
State
MS
County
Hinds
City
Jackson
Urban/Class Level
Mixed
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
2000
Post Construction Study Date
2007
Construction Start Date
2001
Construction End Date
2004
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2004
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$15,900,000
Actual Cost (2022$)
$29,066,900
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-20 Interchange
Attachments
No attachments were submitted.