Project: I-70 and 110th Street Interchange

Summary

The I-70 and 110th Street Interchange was rebuilt and I-70 was widened between 465 and 1/4 miles west of 110th Street, toll booths were moved, and US 24 was realigned (State Street).

Characteristics and Setting

Classification/Type Interchange
Transportation Mode Highway
Usage 3,270
Length (mi)
Economic Distress 0.72
Population Density (ppl/sq mi) 1,015
Population Growth Rate (%) -0.6%
Employment Growth Rate (%) 0.8%
Market Size 823,293
Airport Travel Distance (mi) 24.0667
Topography 13

Geography

Region Great Lakes / Plains
State KS
County Wyandotte
City Kansas City
Urban/Class Level Mixed
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2008
Construction Start Date 1995
Construction End Date 2001
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $49,700,000
Actual Cost (2022$) $101,931,200

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

I-70 AND 110TH STREET INTERCHANGE

Attachments

Transp Infrastructure Investments and Econ Growth - Five KS Case Studies