Project: New Phalen Boulevard Corridor
Summary
Phalen Boulevard, a new 2.5 mile urban access road built along a blighted rail corridor in St. Paul, MN provides access to hundreds of acres of originally contaminated land for redevelopment.
Characteristics and Setting
Classification/Type
Access Road
Transportation Mode
Highway
Usage
18,000
Length (mi)
2.70
Economic Distress
0.85
Population Density (ppl/sq mi)
3,196
Population Growth Rate (%)
-0.6%
Employment Growth Rate (%)
0.5%
Market Size
1,403,056
Airport Travel Distance (mi)
23.0000
Topography
4
Geography
Region
Great Lakes / Plains
State
MN
County
Ramsey
City
St. Paul
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2008
Construction Start Date
2000
Construction End Date
2004
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$60,000,000
Actual Cost (2022$)
$109,686,600
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
PHALEN BOULEVARD CASE STUDY ST. PAUL, MN
Attachments
No attachments were submitted.