Project: Colma BART Station

Summary

The Colma BART station was part of the first phase of extending the BART system from Daly City to the San Francisco International Airport. The station includes a garage with 1,400 parking spaces, 24 bicycle locker, significant roadway improvements, and additional access ramp lanes. Most of the development around this station consists of four new multi-family housing projects

Characteristics and Setting

Classification/Type In-fill Transit Station
Transportation Mode Heavy Rail
Usage 3,759
Length (mi) 0.00
Economic Distress 0.80
Population Density (ppl/sq mi) 1,561
Population Growth Rate (%) -0.2%
Employment Growth Rate (%) -1.2%
Market Size 1,730,543
Airport Travel Distance (mi) 21.0000
Topography 16

Geography

Region Rocky Mountain / Far West
State CA
County San Mateo
City Daly City and Colma
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Transit

Timing

Initial Study Date 1992
Post Construction Study Date 2007
Construction Start Date 1993
Construction End Date 1996
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1993
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $165,700,000
Actual Cost (2022$) $413,677,500

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$71,400,000
Intermodal Actual Cost (2022$)
$115,108,165
Highway Road Access Improvement Cost (YOE $)
$94,300,000

In-fill Transit Station

Average Annual Daily Traffic
224,000
Number of Parking Spaces
1,400

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total