The Lindbergh Station City Center project was planned as a mixed-use transit-oriented development. Twenty four million dollars were invested by MARTA which included platform additions, stairs, escalators, elevators, concourse areas, fare gates, an upgraded bus transfer system, and a ground-level street plaza. The development around the station included 1 million square feet of office space, 300,000 square feet of retail space, and 714 residential units.
Characteristics and Setting
Classification/Type
In-fill Transit Station
Transportation Mode
Heavy Rail
Usage
9,689
Length (mi)
0.00
Economic Distress
1.00
Population Density (ppl/sq mi)
1,825
Population Growth Rate (%)
2.6%
Employment Growth Rate (%)
1.1%
Market Size
1,442,317
Airport Travel Distance (mi)
20.0000
Topography
5
Geography
Region
Southeast
State
GA
County
Fulton
City
Lindberg/Morosgo
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Transit
Timing
Initial Study Date
2000
Post Construction Study Date
2008
Construction Start Date
2000
Construction End Date
2004
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2001
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$26,000,000
Actual Cost (2022$)
$53,324,200
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $24,000,000
- Intermodal Actual Cost (2022$)
- $31,569,554
- Highway Road Access Improvement Cost (YOE $)
- $2,000,000
In-fill Transit Station
- Average Annual Daily Traffic
- 43,000
- Number of Parking Spaces
- 10,461
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
MARTA Lindberg Station
Attachments
No attachments were submitted.