Project: Bellevue Transit Center, Bellevue, WA

Summary

The Bellevue Transit Center Expansion increased the platform length and the number of bus bays and created/improved interchanges connecting to highways that accessed downtown Bellevue, WA

Characteristics and Setting

Classification/Type In-fill Transit Station
Transportation Mode Bus Rapid Transit
Usage 5,738
Length (mi) 0.00
Economic Distress 0.89
Population Density (ppl/sq mi) 863
Population Growth Rate (%) 0.9%
Employment Growth Rate (%) 1.0%
Market Size 900,155
Airport Travel Distance (mi) 17.0000
Topography 21

Geography

Region Rocky Mountain / Far West
State WA
County King
City Bellevue
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Transit

Timing

Initial Study Date 2000
Post Construction Study Date 2008
Construction Start Date 2002
Construction End Date 2005
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2002
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $176,183,586
Actual Cost (2022$) $350,507,800

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$19,320,000
Intermodal Actual Cost (2022$)
$25,017,950
Highway Road Access Improvement Cost (YOE $)
$156,863,586

In-fill Transit Station

Average Annual Daily Traffic
147,000
Number of Parking Spaces
N/A

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Bellevue Transit Center, Bellevue, WA

Attachments

No attachments were submitted.