Project: Tchoupitoulas Corridor
Summary
The Clarence Henry Truckway is a two-lane, 3.5 mile road that provides dedicated access to the Port of New Orleans for truck transporting cargo. The project also included widening Tchoupitoulas Street, the road formerly used to access to the port, from a two lane to a three lane roadway, improving access to U.S. 90, and accompanying sewer, drainage, and flood wall improvements to provide security and protection for the port.
Characteristics and Setting
Classification/Type
Freight Terminal
Transportation Mode
Highway
Usage
10,367
Length (mi)
3.50
Economic Distress
0.98
Population Density (ppl/sq mi)
1,164
Population Growth Rate (%)
-15.1%
Employment Growth Rate (%)
-7.8%
Market Size
516,098
Airport Travel Distance (mi)
18.0000
Topography
1
Geography
Region
Southeast
State
LA
County
Orleans Parish
City
New Orleans
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Local Roads
Timing
Initial Study Date
1993
Post Construction Study Date
2007
Construction Start Date
1993
Construction End Date
2003
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1995
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$141,904,690
Actual Cost (2022$)
$337,370,600
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $101,480,000
- Intermodal Actual Cost (2022$)
- $155,121,236
- Highway Road Access Improvement Cost (YOE $)
- $40,424,690
Freight Terminal
- Container Volume (Metric Tons)
- 2,953,432
- Container Volume (TEUs)
- 0
- All Cargo Volume (Metric Tons)
- 3,035,085
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Tchoupitoulas Corridor
Attachments
No attachments were submitted.