Project: Tchoupitoulas Corridor

Summary

The Clarence Henry Truckway is a two-lane, 3.5 mile road that provides dedicated access to the Port of New Orleans for truck transporting cargo. The project also included widening Tchoupitoulas Street, the road formerly used to access to the port, from a two lane to a three lane roadway, improving access to U.S. 90, and accompanying sewer, drainage, and flood wall improvements to provide security and protection for the port.

Characteristics and Setting

Classification/Type Freight Terminal
Transportation Mode Highway
Usage 10,367
Length (mi) 3.50
Economic Distress 0.98
Population Density (ppl/sq mi) 1,164
Population Growth Rate (%) -15.1%
Employment Growth Rate (%) -7.8%
Market Size 516,098
Airport Travel Distance (mi) 18.0000
Topography 1

Geography

Region Southeast
State LA
County Orleans Parish
City New Orleans
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Local Roads

Timing

Initial Study Date 1993
Post Construction Study Date 2007
Construction Start Date 1993
Construction End Date 2003
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1995
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $141,904,690
Actual Cost (2022$) $337,370,600

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$101,480,000
Intermodal Actual Cost (2022$)
$155,121,236
Highway Road Access Improvement Cost (YOE $)
$40,424,690

Freight Terminal

Container Volume (Metric Tons)
2,953,432
Container Volume (TEUs)
0
All Cargo Volume (Metric Tons)
3,035,085

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Tchoupitoulas Corridor

Attachments

No attachments were submitted.