Project: Huntsville Alabama

Summary

The Huntsville, AL International Intermodal Center (IIC) consists of air and rail cargo operations and includes an access road connection to the highway. The runway was extended in 2004 and the nearby JetPlex Industrial park has 5.6 m square feet of space.

Characteristics and Setting

Classification/Type Freight Terminal
Transportation Mode Highway
Usage 7,000
Length (mi) 0.87
Economic Distress 1.00
Population Density (ppl/sq mi) 381
Population Growth Rate (%) 1.7%
Employment Growth Rate (%) 2.2%
Market Size 176,897
Airport Travel Distance (mi) 20.0000
Topography 6

Geography

Region Southeast
State AL
County Madison
City Huntsville
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Highway and Rail

Timing

Initial Study Date 1985
Post Construction Study Date 2008
Construction Start Date 1986
Construction End Date 2004
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2008
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $115,709,708
Actual Cost (2022$) $181,111,500

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$107,870,000
Intermodal Actual Cost (2022$)
$116,714,916
Highway Road Access Improvement Cost (YOE $)
$7,839,708

Freight Terminal

Container Volume (Metric Tons)
73,569
Container Volume (TEUs)
N/A
All Cargo Volume (Metric Tons)
N/A

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Huntsville Alabama

Attachments

No attachments were submitted.