Project: Global III Intermodal Terminal - Rochelle, IL
Summary
The Global III Intermodal Facility in Rochelle, IL is a hub for rail intermodal shipments to the Northern Midwest with links to the rest of the country and the world.
Characteristics and Setting
Classification/Type
Freight Terminal
Transportation Mode
Highway
Usage
13,900
Length (mi)
0.00
Economic Distress
1.08
Population Density (ppl/sq mi)
61
Population Growth Rate (%)
0.5%
Employment Growth Rate (%)
1.1%
Market Size
26,596
Airport Travel Distance (mi)
56.0000
Topography
4
Geography
Region
Great Lakes / Plains
State
IL
County
Ogle, Lee
City
Rochelle
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
Highway and Rail
Timing
Initial Study Date
2001
Post Construction Study Date
2008
Construction Start Date
2002
Construction End Date
2003
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2003
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$186,000,000
Actual Cost (2022$)
$361,359,500
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $181,000,000
- Intermodal Actual Cost (2022$)
- $229,158,788
- Highway Road Access Improvement Cost (YOE $)
- $5,000,000
Freight Terminal
- Container Volume (Metric Tons)
- N/A
- Container Volume (TEUs)
- 284,546
- All Cargo Volume (Metric Tons)
- N/A
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Global III Intermodal Terminal - Rochelle, IL