Project: Devens Intermodal Rail Terminal
Summary
The Devens Intermodal facility is a truck-rail facility in Ayer, Massachusetts that provides distribution services for businesses dispersed throughout southern New England.
Characteristics and Setting
Classification/Type
Freight Terminal
Transportation Mode
Highway
Usage
0
Length (mi)
0.00
Economic Distress
0.87
Population Density (ppl/sq mi)
1,781
Population Growth Rate (%)
-0.1%
Employment Growth Rate (%)
-0.2%
Market Size
1,742,936
Airport Travel Distance (mi)
12.0000
Topography
9
Geography
Region
New England/Mid-Atlantic
State
MA
County
Middlesex
City
Ayer
Urban/Class Level
Mixed
Local Area
N/A
Impact Area
N/A
Transportation System
Highway and Rail
Timing
Initial Study Date
1990
Post Construction Study Date
2000
Construction Start Date
1992
Construction End Date
1993
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2006
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$5,153,770
Actual Cost (2022$)
$12,866,600
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $2,000,000
- Intermodal Actual Cost (2022$)
- $3,224,318
- Highway Road Access Improvement Cost (YOE $)
- $3,153,770
Freight Terminal
- Container Volume (Metric Tons)
- N/A
- Container Volume (TEUs)
- 82,476
- All Cargo Volume (Metric Tons)
- N/A
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Devens Intermodal Rail Terminal
Attachments
No attachments were submitted.