Project: Auburn Intermodal Center
Summary
Auburn Intermodal Facility is a truck-rail intermodal yard which includes parking, container storage, and a weighing and freight-control operations center.
Characteristics and Setting
Classification/Type
Freight Terminal
Transportation Mode
Highway
Usage
0
Length (mi)
Economic Distress
1.02
Population Density (ppl/sq mi)
228
Population Growth Rate (%)
0.6%
Employment Growth Rate (%)
1.1%
Market Size
68,114
Airport Travel Distance (mi)
38.0000
Topography
10
Geography
Region
New England/Mid-Atlantic
State
ME
County
Androscoggin
City
Auburn
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Auburn Intermodal Facility
Timing
Initial Study Date
1992
Post Construction Study Date
2003
Construction Start Date
1993
Construction End Date
2001
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1969
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$5,300,000
Actual Cost (2022$)
$10,869,900
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $5,300,000
- Intermodal Actual Cost (2022$)
- $6,443,286
- Highway Road Access Improvement Cost (YOE $)
- N/A
Freight Terminal
- Container Volume (Metric Tons)
- N/A
- Container Volume (TEUs)
- 30,000
- All Cargo Volume (Metric Tons)
- N/A
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
AUBURN INTERMODAL FACILITY
Attachments
No attachments were submitted.