Project: Auburn Intermodal Center

Summary

Auburn Intermodal Facility is a truck-rail intermodal yard which includes parking, container storage, and a weighing and freight-control operations center.

Characteristics and Setting

Classification/Type Freight Terminal
Transportation Mode Highway
Usage 0
Length (mi)
Economic Distress 1.02
Population Density (ppl/sq mi) 228
Population Growth Rate (%) 0.6%
Employment Growth Rate (%) 1.1%
Market Size 68,114
Airport Travel Distance (mi) 38.0000
Topography 10

Geography

Region New England/Mid-Atlantic
State ME
County Androscoggin
City Auburn
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Auburn Intermodal Facility

Timing

Initial Study Date 1992
Post Construction Study Date 2003
Construction Start Date 1993
Construction End Date 2001
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1969
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $5,300,000
Actual Cost (2022$) $10,869,900

Intermodal Characteristics:

Intermodal Actual Cost (YOE)
$5,300,000
Intermodal Actual Cost (2022$)
$6,443,286
Highway Road Access Improvement Cost (YOE $)
N/A

Freight Terminal

Container Volume (Metric Tons)
N/A
Container Volume (TEUs)
30,000
All Cargo Volume (Metric Tons)
N/A

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

AUBURN INTERMODAL FACILITY