Project: Georgetown Bypass
Summary
The Georgetown Bypass provides an alternative route south of the congested city branching from US-460 two miles west of the city center and reconnects to US-460 1.5 miles west of the city center. It is also known as the US-460 Bypass and McClelland Circle.
Characteristics and Setting
Classification/Type
Bypass (around Community)
Transportation Mode
Highway
Usage
42,516
Length (mi)
5.50
Economic Distress
1.33
Population Density (ppl/sq mi)
145
Population Growth Rate (%)
3.7%
Employment Growth Rate (%)
1.1%
Market Size
240,991
Airport Travel Distance (mi)
28.3500
Topography
14
Geography
Region
Southeast
State
KY
County
Scott
City
Georgetown
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1969
Post Construction Study Date
1999
Construction Start Date
1991
Construction End Date
1994
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1994
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$24,440,000
Actual Cost (2022$)
$61,015,600
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|