Project: Georgetown Bypass

Summary

The Georgetown Bypass provides an alternative route south of the congested city branching from US-460 two miles west of the city center and reconnects to US-460 1.5 miles west of the city center. It is also known as the US-460 Bypass and McClelland Circle.

Characteristics and Setting

Classification/Type Bypass (around Community)
Transportation Mode Highway
Usage 42,516
Length (mi) 5.50
Economic Distress 1.33
Population Density (ppl/sq mi) 145
Population Growth Rate (%) 3.7%
Employment Growth Rate (%) 1.1%
Market Size 240,991
Airport Travel Distance (mi) 28.3500
Topography 14

Geography

Region Southeast
State KY
County Scott
City Georgetown
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1969
Post Construction Study Date 1999
Construction Start Date 1991
Construction End Date 1994
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1994
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $24,440,000
Actual Cost (2022$) $61,015,600

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Georgetown Bypass

Attachments

Georgetown Bypass