Project: Hollister SR156
Summary
The Hollister bypass was constructed in 1997 along SR-156 in San Benito County, California with the primary purpose of diverting inter-regional truck traffic from the downtown area.
Characteristics and Setting
Classification/Type
Bypass (around Community)
Transportation Mode
Highway
Usage
10,000
Length (mi)
5.50
Economic Distress
0.74
Population Density (ppl/sq mi)
39
Population Growth Rate (%)
-0.1%
Employment Growth Rate (%)
1.0%
Market Size
68,800
Airport Travel Distance (mi)
65.2333
Topography
20
Geography
Region
Rocky Mountain / Far West
State
CA
County
San Benito
City
Hollister
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2003
Construction Start Date
1985
Construction End Date
1997
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$15,000,000
Actual Cost (2022$)
$40,352,600
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|