Project: Santan Freeway: part of Maricopa RTP, AZ
Summary
The Santan Freeway is a new 3-lane portion of the Loop/State Route 202 beltway around Phoenix, AZ. The 12-mile of the Santan Freeway is the longest single stretch of freeway ever built in the Phoenix metro area.
Characteristics and Setting
Classification/Type
Widening
Transportation Mode
Highway
Usage
144,382
Length (mi)
24.80
Economic Distress
1.07
Population Density (ppl/sq mi)
411
Population Growth Rate (%)
3.4%
Employment Growth Rate (%)
3.5%
Market Size
1,253,106
Airport Travel Distance (mi)
10.5167
Topography
17
Geography
Region
Southwest
State
AZ
County
Maricopa
City
Mesa, Gilbert, & Chandler
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1999
Post Construction Study Date
2006
Construction Start Date
1999
Construction End Date
2006
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2006
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$978,500,000
Actual Cost (2022$)
$1,901,023,100
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Santan Freeway: part of Maricopa RTP, AZ
Attachments
No attachments were submitted.