Project: I-95 and Route 128 Peabody

Summary

Construction of an interchange between US 1/I-95/MA 128 at Peabody, Massachusetts. Project included a direct connection between i-95 and MA 128, realignment of MA 128 north of the interchange, and a second interchange from MA 128 at Centennial Drive and Forest Street in Peabody.

Characteristics and Setting

Classification/Type Interchange
Transportation Mode Highway
Usage 86,100
Length (mi) 1.50
Economic Distress 0.67
Population Density (ppl/sq mi) 1,461
Population Growth Rate (%) 0.0%
Employment Growth Rate (%) 0.6%
Market Size 1,283,825
Airport Travel Distance (mi) 35.9700
Topography 4

Geography

Region New England/Mid-Atlantic
State MA
County Essex
City Peabody
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1981
Post Construction Study Date 2006
Construction Start Date 1984
Construction End Date 1988
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1987
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $38,000,000
Actual Cost (2022$) $112,180,200

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

I-95 and Route 128 Peabody

Attachments