Project: I-95 and Route 128 Peabody
Summary
Construction of an interchange between US 1/I-95/MA 128 at Peabody, Massachusetts. Project included a direct connection between i-95 and MA 128, realignment of MA 128 north of the interchange, and a second interchange from MA 128 at Centennial Drive and Forest Street in Peabody.
Characteristics and Setting
Classification/Type
Interchange
Transportation Mode
Highway
Usage
86,100
Length (mi)
1.50
Economic Distress
0.67
Population Density (ppl/sq mi)
1,461
Population Growth Rate (%)
0.0%
Employment Growth Rate (%)
0.6%
Market Size
1,283,825
Airport Travel Distance (mi)
35.9700
Topography
4
Geography
Region
New England/Mid-Atlantic
State
MA
County
Essex
City
Peabody
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1981
Post Construction Study Date
2006
Construction Start Date
1984
Construction End Date
1988
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1987
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$38,000,000
Actual Cost (2022$)
$112,180,200
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-95 and Route 128 Peabody
Attachments
No attachments were submitted.