Project: E-470 Denver
Summary
E-470 is a private, 47-mile long toll road that forms an outer beltway around the eastern side of Denver from Colorado C-470/Interstate 25 in the south to Interstate 25/Northwest Parkway in the north.
Characteristics and Setting
Classification/Type
Beltway (within Metro Area)
Transportation Mode
Highway
Usage
160,818
Length (mi)
47.00
Economic Distress
1.24
Population Density (ppl/sq mi)
425
Population Growth Rate (%)
1.2%
Employment Growth Rate (%)
0.5%
Market Size
937,204
Airport Travel Distance (mi)
38.6934
Topography
9
Geography
Region
Rocky Mountain / Far West
State
CO
County
Boulder, Adams, Denver, Douglas, Arapahoe
City
Denver
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1987
Post Construction Study Date
2006
Construction Start Date
1988
Construction End Date
2003
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1999
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$1,547,215,594
Actual Cost (2022$)
$3,320,896,600
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
E-470 Denver
Attachments
No attachments were submitted.