Project: I-70 Glenwood Canyon

Summary

I-70 through the Glenwood Canyon, which required double-decking the existing two-lane highway, included over 40 bridges and viaducts, and five tunnels. The widening of this route has significantly improved safety, provides access to the river and tourist destinations, and has become a major thoroughfare for freight transportation across Colorado.

Characteristics and Setting

Classification/Type Widening
Transportation Mode Highway
Usage 17,000
Length (mi) 12.50
Economic Distress 1.41
Population Density (ppl/sq mi) 17
Population Growth Rate (%) 2.5%
Employment Growth Rate (%) 4.5%
Market Size 14,621
Airport Travel Distance (mi) 56.1500
Topography 17

Geography

Region Rocky Mountain / Far West
State CO
County Garfield
City Glenwood Springs
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1987
Post Construction Study Date 1997
Construction Start Date 1987
Construction End Date 1992
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 1992
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $490,000,000
Actual Cost (2022$) $1,346,878,700

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

I-70 Glenwood Canyon