Project: I-15 Reconstruction - Salt Lake City
Summary
The I-15 Reconstruction Project involved the rebuilding and widening of a deteriorated, congested 17 mile stretch of Interstate 15, running through Salt Lake City. The project was necessary to accommodate the rapid growth the region was experiencing, much of which was due to in-migration from California.
Characteristics and Setting
Classification/Type
Widening
Transportation Mode
Highway
Usage
77,588
Length (mi)
17.00
Economic Distress
1.26
Population Density (ppl/sq mi)
1,343
Population Growth Rate (%)
1.6%
Employment Growth Rate (%)
1.8%
Market Size
589,457
Airport Travel Distance (mi)
17.4333
Topography
21
Geography
Region
Rocky Mountain / Far West
State
UT
County
Salt Lake
City
Salt Lake City
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1995
Post Construction Study Date
2006
Construction Start Date
1996
Construction End Date
2001
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2001
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$1,520,000,000
Actual Cost (2022$)
$3,262,481,800
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-15 Reconstruction - Salt Lake City
Attachments