Project: Appleton, Wisconsin, Route 441 Beltway

Summary

Route 441 circumvents the city of Appleton, Wisconsin on the eastern side. This route, along with US 41, forms a square-shaped beltway around the city.

Characteristics and Setting

Classification/Type Beltway (within Metro Area)
Transportation Mode Highway
Usage 58,000
Length (mi) 10.90
Economic Distress 1.25
Population Density (ppl/sq mi) 270
Population Growth Rate (%) 0.8%
Employment Growth Rate (%) 1.1%
Market Size 225,302
Airport Travel Distance (mi) 18.6900
Topography 4

Geography

Region Great Lakes / Plains
State WI
County Winnebago, Outagamie, Calumet
City Appleton
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1987
Post Construction Study Date 2000
Construction Start Date 1988
Construction End Date 1993
Months Duration N/A

Costs

Project Year of Expenditure (YOE) 2004
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $180,000,000
Actual Cost (2022$) $329,059,700

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Appleton, Wisconsin, Route 441 Beltway

Attachments

Economic Impact of Freeway Bypass Routes in Medium Size Cities