Project: Appleton, Wisconsin, Route 441 Beltway
Summary
Route 441 circumvents the city of Appleton, Wisconsin on the eastern side. This route, along with US 41, forms a square-shaped beltway around the city.
Characteristics and Setting
Classification/Type
Beltway (within Metro Area)
Transportation Mode
Highway
Usage
58,000
Length (mi)
10.90
Economic Distress
1.25
Population Density (ppl/sq mi)
270
Population Growth Rate (%)
0.8%
Employment Growth Rate (%)
1.1%
Market Size
225,302
Airport Travel Distance (mi)
18.6900
Topography
4
Geography
Region
Great Lakes / Plains
State
WI
County
Winnebago, Outagamie, Calumet
City
Appleton
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1987
Post Construction Study Date
2000
Construction Start Date
1988
Construction End Date
1993
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
2004
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$180,000,000
Actual Cost (2022$)
$329,059,700
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Appleton, Wisconsin, Route 441 Beltway
Attachments
Economic Impact of Freeway Bypass Routes in Medium Size Cities