Project: Interstate 27
Summary
Interstate 27 is a north-south highway, which traverses the northern panhandle and high plains of Texas.
Characteristics and Setting
Classification/Type
New Highway/Freeway
Transportation Mode
Highway
Usage
29,912
Length (mi)
124.00
Economic Distress
1.30
Population Density (ppl/sq mi)
137
Population Growth Rate (%)
1.0%
Employment Growth Rate (%)
1.5%
Market Size
115,764
Airport Travel Distance (mi)
17.9448
Topography
3
Geography
Region
Southwest
State
TX
County
Lubbock, Swisher, Randall, Potter
City
Amarillo to Lubbock
Urban/Class Level
Mixed
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1974
Post Construction Study Date
2002
Construction Start Date
1974
Construction End Date
1992
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1992
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$453,400,000
Actual Cost (2022$)
$1,450,411,700
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|