Project: SR 29
Summary
Route 29 (SR 29) is a four-lane State Road with grade-separated interchanges along a 182-mile corridor between Chippewa Falls and Green Bay.
Characteristics and Setting
Classification/Type
New Highway/Freeway
Transportation Mode
Highway
Usage
889
Length (mi)
182.00
Economic Distress
1.07
Population Density (ppl/sq mi)
57
Population Growth Rate (%)
0.7%
Employment Growth Rate (%)
1.5%
Market Size
115,280
Airport Travel Distance (mi)
33.5032
Topography
4
Geography
Region
Great Lakes / Plains
State
WI
County
Brown, Chippewa, Clark, Marathon, Shawano
City
Chippewa Falls to Green Bay
Urban/Class Level
Mixed
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2000
Construction Start Date
1991
Construction End Date
2000
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$450,000,000
Actual Cost (2022$)
$1,041,115,300
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|