Project: Interstate 68

Summary

Interstate 68 is part of the Appalachian Development Highway System, a network of roads intended to foster economic development throughout the Appalachian region. The route followed by I-68 was first designated as Corridor E by the Appalachian Regional Development Act of 1965.

Characteristics and Setting

Classification/Type New Highway/Freeway
Transportation Mode Highway
Usage 52,575
Length (mi) 76.00
Economic Distress 1.20
Population Density (ppl/sq mi) 156
Population Growth Rate (%) -0.4%
Employment Growth Rate (%) 1.8%
Market Size 32,894
Airport Travel Distance (mi) 83.2003
Topography 16

Geography

Region New England/Mid-Atlantic
State MD
County Allegany, MD, Garrett, MD, Washington, MD, Monongalia, WV, Preston, WV
City None
Urban/Class Level Mixed
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2005
Construction Start Date 1966
Construction End Date 1991
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $1,209,172,539
Actual Cost (2022$) $2,874,740,900

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

INTERSTATE 68 - MARYLAND

Attachments

Interstate 68 - Maryland