Project: Stonewall Bypass
Summary
Bypass around Stonewall, OK
Characteristics and Setting
Classification/Type
Bypass (around Community)
Transportation Mode
Highway
Usage
4,000
Length (mi)
10.00
Economic Distress
0.80
Population Density (ppl/sq mi)
50
Population Growth Rate (%)
0.5%
Employment Growth Rate (%)
2.8%
Market Size
16,937
Airport Travel Distance (mi)
101.0330
Topography
4
Geography
Region
Southwest
State
OK
County
Pontotoc
City
Stonewall
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
1997
Construction Start Date
1991
Construction End Date
1993
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$7,000,000
Actual Cost (2022$)
$18,264,600
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
STONEWALL BYPASS
Attachments
Methodology for Determining the Impact of Highway Bypasses in Oklahoma