Project: Interlink Station

Summary

The Interlink station, is an inter-modal terminal located at the T.F. Green Airport (PVD), Rhode Island which connects rail, air, bus, automobiles, and rental cars.

Characteristics and Setting

Classification/Type In-fill Transit Station
Transportation Mode Commuter Rail
Usage 414
Length (mi) 0.00
Economic Distress 0.98
Population Density (ppl/sq mi) 905
Population Growth Rate (%) -0.1%
Employment Growth Rate (%) 1.3%
Market Size 1,139,647
Airport Travel Distance (mi) 0.0000
Topography 9

Geography

Region New England/Mid-Atlantic
State RI
County Kent
City Warwick
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 2006
Post Construction Study Date 2015
Construction Start Date 2007
Construction End Date 2010
Months Duration 37

Costs

Project Year of Expenditure (YOE) 2010
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $280,000,000
Actual Cost (2022$) $413,906,100

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Interlink Station

Attachments

No attachments were submitted.