Project: Interlink Station
Summary
The Interlink station, is an inter-modal terminal located at the T.F. Green Airport (PVD), Rhode Island which connects rail, air, bus, automobiles, and rental cars.
Characteristics and Setting
Classification/Type
In-fill Transit Station
Transportation Mode
Commuter Rail
Usage
414
Length (mi)
0.00
Economic Distress
0.98
Population Density (ppl/sq mi)
905
Population Growth Rate (%)
-0.1%
Employment Growth Rate (%)
1.3%
Market Size
1,139,647
Airport Travel Distance (mi)
0.0000
Topography
9
Geography
Region
New England/Mid-Atlantic
State
RI
County
Kent
City
Warwick
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
2006
Post Construction Study Date
2015
Construction Start Date
2007
Construction End Date
2010
Months Duration
37
Costs
Project Year of Expenditure (YOE)
2010
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$280,000,000
Actual Cost (2022$)
$413,906,100
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Interlink Station