Project: Airport Max Red Line Extension
Summary
The Airport MAX Red Line is a 5.5 mile extension of the light rail system in Portland, Oregon. This line extension project includes 4 stations and connects the Gateway Transit Center to Portland International Airport (PDX).
Characteristics and Setting
Classification/Type
Transit Line Extension
Transportation Mode
Light Rail
Usage
26,122
Length (mi)
5.50
Economic Distress
1.07
Population Density (ppl/sq mi)
1,514
Population Growth Rate (%)
0.9%
Employment Growth Rate (%)
2.2%
Market Size
1,791,392
Airport Travel Distance (mi)
0.0000
Topography
21
Geography
Region
Rocky Mountain / Far West
State
OR
County
Multnomah
City
Portland
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
TriMet
Timing
Initial Study Date
1998
Post Construction Study Date
2006
Construction Start Date
1998
Construction End Date
2001
Months Duration
28
Costs
Project Year of Expenditure (YOE)
1999
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$125,800,000
Actual Cost (2022$)
$258,007,000
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Airport Max Red Line Extension
Attachments
No attachments were submitted.