Project: Airport Max Red Line Extension

Summary

The Airport MAX Red Line is a 5.5 mile extension of the light rail system in Portland, Oregon. This line extension project includes 4 stations and connects the Gateway Transit Center to Portland International Airport (PDX).

Characteristics and Setting

Classification/Type Transit Line Extension
Transportation Mode Light Rail
Usage 26,122
Length (mi) 5.50
Economic Distress 1.07
Population Density (ppl/sq mi) 1,514
Population Growth Rate (%) 0.9%
Employment Growth Rate (%) 2.2%
Market Size 1,791,392
Airport Travel Distance (mi) 0.0000
Topography 21

Geography

Region Rocky Mountain / Far West
State OR
County Multnomah
City Portland
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System TriMet

Timing

Initial Study Date 1998
Post Construction Study Date 2006
Construction Start Date 1998
Construction End Date 2001
Months Duration 28

Costs

Project Year of Expenditure (YOE) 1999
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $125,800,000
Actual Cost (2022$) $258,007,000

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Airport Max Red Line Extension

Attachments