Project: Verona Bypass
Summary
Bypass around Verona, WI in metro Madison.
Characteristics and Setting
Classification/Type
Bypass (around Community)
Transportation Mode
Highway
Usage
47,010
Length (mi)
2.70
Economic Distress
0.70
Population Density (ppl/sq mi)
391
Population Growth Rate (%)
1.5%
Employment Growth Rate (%)
2.0%
Market Size
285,644
Airport Travel Distance (mi)
13.6333
Topography
14
Geography
Region
Great Lakes / Plains
State
WI
County
Dane
City
Verona
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2000
Construction Start Date
1990
Construction End Date
1995
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$30,000,000
Actual Cost (2022$)
$71,323,300
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|