Project: Highway 141: Page-Olive Connector
Summary
The 2-mile long Page-Olive Connector, extends the Maryland Heights Expressway from MO 364 (Page Avenue) to MO 340 (Olive Boulevard) under a design-build contract from the St. Louis County Department of Highways & Traffic and Public Works in St. Louis County, Missouri.
Characteristics and Setting
Classification/Type
Connector Highway
Transportation Mode
Highway
Usage
28,243
Length (mi)
2.00
Economic Distress
1.30
Population Density (ppl/sq mi)
1,954
Population Growth Rate (%)
-0.1%
Employment Growth Rate (%)
-0.3%
Market Size
1,881,781
Airport Travel Distance (mi)
11.6000
Topography
14
Geography
Region
Great Lakes / Plains
State
MO
County
St. Louis
City
Chesterfield & Maryland Heights
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
2009
Post Construction Study Date
2017
Construction Start Date
2010
Construction End Date
2012
Months Duration
29
Costs
Project Year of Expenditure (YOE)
2010
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$52,500,000
Actual Cost (2022$)
$73,363,500
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Highway 141: Page-Olive Connector
Attachments
No attachments were submitted.