Project: 95 Express Lanes Phase 1A & 1B
Summary
In order to ease congestion, single HOV lanes (one running north and one running south) were converted to 2 High Occupancy Toll (HOT) lanes on I-95 between I-595 and the southern tip of Broward County in Miami-Dade County. Use of these tolled lanes is also permitted for transit buses and registered carpools.
Characteristics and Setting
Classification/Type
New Highway/Freeway
Transportation Mode
Highway
Usage
248,000
Length (mi)
10.00
Economic Distress
0.78
Population Density (ppl/sq mi)
1,191
Population Growth Rate (%)
1.3%
Employment Growth Rate (%)
1.6%
Market Size
3,788,108
Airport Travel Distance (mi)
10.4000
Topography
1
Geography
Region
Southeast
State
FL
County
Miami-Dade, Broward, Palm Beach
City
Miami, North Miami, & North Miami Beach
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
2007
Post Construction Study Date
2015
Construction Start Date
2008
Construction End Date
2010
Months Duration
23
Costs
Project Year of Expenditure (YOE)
2008
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$139,000,000
Actual Cost (2022$)
$205,474,800
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
95 Express Lanes Phase 1A & 1B