Project: 95 Express Lanes Phase 1A & 1B

Summary

In order to ease congestion, single HOV lanes (one running north and one running south) were converted to 2 High Occupancy Toll (HOT) lanes on I-95 between I-595 and the southern tip of Broward County in Miami-Dade County. Use of these tolled lanes is also permitted for transit buses and registered carpools.

Characteristics and Setting

Classification/Type New Highway/Freeway
Transportation Mode Highway
Usage 248,000
Length (mi) 10.00
Economic Distress 0.78
Population Density (ppl/sq mi) 1,191
Population Growth Rate (%) 1.3%
Employment Growth Rate (%) 1.6%
Market Size 3,788,108
Airport Travel Distance (mi) 10.4000
Topography 1

Geography

Region Southeast
State FL
County Miami-Dade, Broward, Palm Beach
City Miami, North Miami, & North Miami Beach
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 2007
Post Construction Study Date 2015
Construction Start Date 2008
Construction End Date 2010
Months Duration 23

Costs

Project Year of Expenditure (YOE) 2008
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $139,000,000
Actual Cost (2022$) $205,474,800

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

95 Express Lanes Phase 1A & 1B