Project: Pioneer Crossing

Summary

Pioneer Crossing is a 6-mile East-West Connector that crosses over I-15 using a diverging diamond interchange (DDI) interchange.

Characteristics and Setting

Classification/Type Connector Highway
Transportation Mode Highway
Usage 25,575
Length (mi) 6.00
Economic Distress 0.60
Population Density (ppl/sq mi) 985
Population Growth Rate (%) 2.3%
Employment Growth Rate (%) 8.5%
Market Size 1,423,191
Airport Travel Distance (mi) 35.0000
Topography 21

Geography

Region Rocky Mountain / Far West
State UT
County Utah, Salt Lake
City Lehi, Saratoga Springs, American Fork, Eagle Mountain
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 2008
Post Construction Study Date 2015
Construction Start Date 2009
Construction End Date 2010
Months Duration 10

Costs

Project Year of Expenditure (YOE) 2009
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $192,000,000
Actual Cost (2022$) $283,821,300

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Pioneer Crossing

Attachments

No attachments were submitted.