Project: Pioneer Crossing
Summary
Pioneer Crossing is a 6-mile East-West Connector that crosses over I-15 using a diverging diamond interchange (DDI) interchange.
Characteristics and Setting
Classification/Type
Connector Highway
Transportation Mode
Highway
Usage
25,575
Length (mi)
6.00
Economic Distress
0.60
Population Density (ppl/sq mi)
985
Population Growth Rate (%)
2.3%
Employment Growth Rate (%)
8.5%
Market Size
1,423,191
Airport Travel Distance (mi)
35.0000
Topography
21
Geography
Region
Rocky Mountain / Far West
State
UT
County
Utah, Salt Lake
City
Lehi, Saratoga Springs, American Fork, Eagle Mountain
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
2008
Post Construction Study Date
2015
Construction Start Date
2009
Construction End Date
2010
Months Duration
10
Costs
Project Year of Expenditure (YOE)
2009
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$192,000,000
Actual Cost (2022$)
$283,821,300
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Pioneer Crossing
Attachments
No attachments were submitted.