Project: Hiawatha Light Rail Line

Summary

The first of the Twin Cities' modern light rail lines was built between downtown Minneapolis and the suburb of Bloomington. The line connects Target Field downtown to the International Airport and the Mall of America and was intended to help ease congestion along Highway 55 and the balance of the Hiawatha corridor.

Characteristics and Setting

Classification/Type New Transit Line
Transportation Mode Light Rail
Usage 31,612
Length (mi) 12.00
Economic Distress 0.51
Population Density (ppl/sq mi) 2,003
Population Growth Rate (%) 0.6%
Employment Growth Rate (%) 1.6%
Market Size 2,436,593
Airport Travel Distance (mi) 0.0000
Topography 4

Geography

Region Great Lakes / Plains
State MN
County Hennepin
City Minneapolis & Bloomington City
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 1999
Post Construction Study Date 2009
Construction Start Date 2000
Construction End Date 2004
Months Duration 42

Costs

Project Year of Expenditure (YOE) 2000
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $715,300,000
Actual Cost (2022$) $1,307,646,800

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map