Project: Legacy Parkway

Summary

Legacy Parkway is an 11.5-mile limited access, four-lane road that is located mostly in Davis County in the state of Utah. The Legacy Parkway begins at an interchange with Interstate 215 (I-215) in northwestern Salt Lake City and continues north to end at Wasatch Weave interchange. There are two intermediate interchanges along Legacy Parkway (in junction with route 500 South and State Route 105) providing access to Woods Cross and Centerville.

Characteristics and Setting

Classification/Type New Highway/Freeway
Transportation Mode Highway
Usage 34,720
Length (mi) 11.50
Economic Distress 0.86
Population Density (ppl/sq mi) 1,124
Population Growth Rate (%) 1.3%
Employment Growth Rate (%) 2.5%
Market Size 1,408,965
Airport Travel Distance (mi) 14.9000
Topography 21

Geography

Region Rocky Mountain / Far West
State UT
County Salt Lake, Davis
City Kaysville, Wood Cross, Centerville, Farmington, Salt Lake City
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 2000
Post Construction Study Date 2013
Construction Start Date 2001
Construction End Date 2008
Months Duration 84

Costs

Project Year of Expenditure (YOE) 2008
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $685,000,000
Actual Cost (2022$) $1,072,177,500

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Legacy Parkway

Attachments

No attachments were submitted.