The Grandview Interchange, which is part of the U.S. 160 east of Durango project, occurred in three phases from 2008 to 2011. The project included the widening of a 2/3-mile section, the construction of 4 bridges, 6 retaining walls, a shared-use path, and an interchange.

Characteristics and Setting

Classification/Type Interchange
Transportation Mode Highway
Usage 26,000
Length (mi) 0.67
Economic Distress 0.61
Population Density (ppl/sq mi) 29
Population Growth Rate (%) 1.3%
Employment Growth Rate (%) 3.4%
Market Size 27,144
Airport Travel Distance (mi) 9.2000
Topography 21

Geography

Region Rocky Mountain / Far West
State CO
County La Plata
City Durango
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date 2007
Post Construction Study Date 2016
Construction Start Date 2008
Construction End Date 2011
Months Duration 35

Costs

Project Year of Expenditure (YOE) 2011
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $46,700,000
Actual Cost (2022$) $66,971,000

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

Grandview Interchange

Attachments

No attachments were submitted.