Project: Grandview Interchange
Summary
The Grandview Interchange, which is part of the U.S. 160 east of Durango project, occurred in three phases from 2008 to 2011. The project included the widening of a 2/3-mile section, the construction of 4 bridges, 6 retaining walls, a shared-use path, and an interchange.
Characteristics and Setting
Classification/Type
Interchange
Transportation Mode
Highway
Usage
26,000
Length (mi)
0.67
Economic Distress
0.61
Population Density (ppl/sq mi)
29
Population Growth Rate (%)
1.3%
Employment Growth Rate (%)
3.4%
Market Size
27,144
Airport Travel Distance (mi)
9.2000
Topography
21
Geography
Region
Rocky Mountain / Far West
State
CO
County
La Plata
City
Durango
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
2007
Post Construction Study Date
2016
Construction Start Date
2008
Construction End Date
2011
Months Duration
35
Costs
Project Year of Expenditure (YOE)
2011
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$46,700,000
Actual Cost (2022$)
$66,971,000
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
Grandview Interchange
Attachments
No attachments were submitted.