Project: I-75 EXPANSION (IROX)

Summary

The I-75 Expansion (iROX) project is 30 miles in length; it widened I-75 from 4 to 6 lanes, reconstructed 20 bridges, and constructed 4 new bridges, several noise barriers, and stormwater management facilities. The project was the first design-build-finance project in the state, and the Florida's largest-ever project completed at the time.

Characteristics and Setting

Classification/Type Widening
Transportation Mode Highway
Usage 98,964
Length (mi) 30.00
Economic Distress 0.65
Population Density (ppl/sq mi) 525
Population Growth Rate (%) 4.0%
Employment Growth Rate (%) 4.8%
Market Size 758,627
Airport Travel Distance (mi) 2.7000
Topography 1

Geography

Region Southeast
State FL
County Collier, Lee
City Fort Myers, Naples, Bonita Springs
Urban/Class Level Metro
Local Area N/A
Impact Area N/A
Transportation System N/A

Timing

Initial Study Date 2006
Post Construction Study Date 2015
Construction Start Date 2007
Construction End Date 2010
Months Duration 35

Costs

Project Year of Expenditure (YOE) 2010
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $458,000,000
Actual Cost (2022$) $677,032,200

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

I-75 EXPANSION (IROX)