Project: BART to San Francisco Airport
Summary
In November 1997, work began on the construction of an 8-mile extension of the Bay Area Rapid Transit (BART) system to San Francisco International Airport (SFO). The total cost of the project was $1.5 billion, and was funded in part by the federal New Starts program, which contributed over half the amount, as well as funding from SFO, BART, San Mateo County Transit (SamTrans), and various other state and local sources.
Characteristics and Setting
Classification/Type
Transit Line Extension
Transportation Mode
Heavy Rail
Usage
40,385
Length (mi)
8.70
Economic Distress
0.80
Population Density (ppl/sq mi)
1,755
Population Growth Rate (%)
0.9%
Employment Growth Rate (%)
2.2%
Market Size
2,668,106
Airport Travel Distance (mi)
13.0000
Topography
16
Geography
Region
Rocky Mountain / Far West
State
CA
County
San Mateo
City
San Bruno
Urban/Class Level
Mixed
Local Area
N/A
Impact Area
N/A
Transportation System
Transit
Timing
Initial Study Date
1997
Post Construction Study Date
2012
Construction Start Date
1997
Construction End Date
2003
Months Duration
72
Costs
Project Year of Expenditure (YOE)
2000
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$1,552,230,000
Actual Cost (2022$)
$3,015,661,800
Intermodal Characteristics:
- Intermodal Actual Cost (YOE)
- $1,552,230,000
- Intermodal Actual Cost (2022$)
- N/A
- Highway Road Access Improvement Cost (YOE $)
- $2,142,077,400
Transit Line Extension
- Average Annual Daily Traffic
- N/A
- Number of Parking Spaces
- N/A
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
BART to San Francisco Airport
Attachments
No attachments were submitted.