Project: U.S. 54 Widening & Relief Route (Alamogordo, NM)

Summary

Due to increasing traffic between Alamogordo, MN and El Paso, TX, Highway 54 was widened from two to four lanes. A Relief Route was also built to divert pass through traffic thus improving safety and decreasing congestion on the business route White Sand boulevard.

Characteristics and Setting

Classification/Type Widening
Transportation Mode Highway
Usage 8,221
Length (mi) 70.00
Economic Distress 1.49
Population Density (ppl/sq mi) 9
Population Growth Rate (%) 280.0%
Employment Growth Rate (%) 96.0%
Market Size 61,526
Airport Travel Distance (mi) 89.0000
Topography 20

Geography

Region Southwest
State NM
County Otero
City Alamogordo
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System Highway

Timing

Initial Study Date 1997
Post Construction Study Date 2007
Construction Start Date 1998
Construction End Date 2001
Months Duration 48

Costs

Project Year of Expenditure (YOE) 2001
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $59,000,000
Actual Cost (2022$) $121,004,900

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

U.S. 54 Widening & Relief Route (Alamogordo, NM)