Project: I-94 / Opportunity Drive Interchange
Summary
The I-94 Opportunity Drive (CASH 75) interchange in St. Cloud, MN added a new highway access ramp that connected I-94 to an industrial park off of the interchange in 2004.
Characteristics and Setting
Classification/Type
Interchange
Transportation Mode
Highway
Usage
2,800
Length (mi)
1.00
Economic Distress
0.76
Population Density (ppl/sq mi)
101
Population Growth Rate (%)
1.0%
Employment Growth Rate (%)
1.2%
Market Size
175,161
Airport Travel Distance (mi)
72.0000
Topography
4
Geography
Region
Great Lakes / Plains
State
MN
County
Stearns
City
St. Cloud
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
MDOT
Timing
Initial Study Date
2002
Post Construction Study Date
2009
Construction Start Date
2003
Construction End Date
2004
Months Duration
18
Costs
Project Year of Expenditure (YOE)
2004
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$7,850,000
Actual Cost (2022$)
$14,350,700
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|
Case Location
Narrative
I-94 / Opportunity Drive Interchange
Attachments
No attachments were submitted.