Project: Carolina Factory Shops Infrastructure

Summary

Construction of water system and access roads to serve the Carolina Factory Shops site. The project included 3 phases and grew 400,0000 sq ft & 800 jobs by 1998.

Characteristics and Setting

Classification/Type Access Road
Transportation Mode Highway
Usage 15,887
Length (mi) 1.30
Economic Distress 1.09
Population Density (ppl/sq mi) 137
Population Growth Rate (%) 0.3%
Employment Growth Rate (%) -0.3%
Market Size 157,852
Airport Travel Distance (mi) 42.2167
Topography 4

Geography

Region Southeast
State SC
County Cherokee
City Gaffney
Urban/Class Level Rural
Local Area N/A
Impact Area N/A
Transportation System None

Timing

Initial Study Date N/A
Post Construction Study Date 2000
Construction Start Date 1995
Construction End Date 1997
Months Duration N/A

Costs

Project Year of Expenditure (YOE) N/A
Planned Cost (YOE $) N/A
Actual Cost (YOE $) $1,034,204
Actual Cost (2022$) $2,392,700

Pre/Post Conditions

NOTE: All pre/post dollar values are in 2022$

Transportation

Measure Pre project Post project Change % Change

Impacts

NOTE: All impact dollar values are in 2022$

Measure Total

Case Location

View Map

Narrative

GAFFNEY ACCESS ROAD

Attachments

ARC Public Works 2000