Project: Carolina Factory Shops Infrastructure
Summary
Construction of water system and access roads to serve the Carolina Factory Shops site. The project included 3 phases and grew 400,0000 sq ft & 800 jobs by 1998.
Characteristics and Setting
Classification/Type
Access Road
Transportation Mode
Highway
Usage
15,887
Length (mi)
1.30
Economic Distress
1.09
Population Density (ppl/sq mi)
137
Population Growth Rate (%)
0.3%
Employment Growth Rate (%)
-0.3%
Market Size
157,852
Airport Travel Distance (mi)
42.2167
Topography
4
Geography
Region
Southeast
State
SC
County
Cherokee
City
Gaffney
Urban/Class Level
Rural
Local Area
N/A
Impact Area
N/A
Transportation System
None
Timing
Initial Study Date
N/A
Post Construction Study Date
2000
Construction Start Date
1995
Construction End Date
1997
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
N/A
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$1,034,204
Actual Cost (2022$)
$2,392,700
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|