Project: Clermont County Industrial Park in Miami
Summary
Eastman Drive was built to provide Park 50 Technecenter industrial park access to Interstate 275.
Characteristics and Setting
Classification/Type
Access Road
Transportation Mode
Highway
Usage
62,306
Length (mi)
1.00
Economic Distress
1.30
Population Density (ppl/sq mi)
423
Population Growth Rate (%)
1.2%
Employment Growth Rate (%)
3.4%
Market Size
619,056
Airport Travel Distance (mi)
36.7000
Topography
14
Geography
Region
Great Lakes / Plains
State
OH
County
Clermont
City
Milford
Urban/Class Level
Metro
Local Area
N/A
Impact Area
N/A
Transportation System
Highway
Timing
Initial Study Date
1982
Post Construction Study Date
2000
Construction Start Date
1982
Construction End Date
1996
Months Duration
N/A
Costs
Project Year of Expenditure (YOE)
1996
Planned Cost (YOE $)
N/A
Actual Cost (YOE $)
$2,063,090
Actual Cost (2022$)
$5,814,700
Pre/Post Conditions
NOTE: All pre/post dollar values are in 2022$
Transportation
| Measure | Pre project | Post project | Change | % Change |
|---|
Impacts
NOTE: All impact dollar values are in 2022$
| Measure | Total |
|---|